Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

\uD83E\uDD45 Goals

  • Last meeting of 2023!!

  • Weekly updates

  • Discuss Rick meeting

  • Ordering

\uD83D\uDDE3 Discussion topics

Time

Item

Presenter

Notes

Welcome!

Vann

  • BREAK IN 3 DAYS! 🎄🎅🚥


Announcements

Vann

  • Rick Stamper Meeting

    • Jan 24 @10am

  • Ordering

    • Great time to order, please get things to me by tomorrow @5pm

  • BIC Server

    • If you aren’t on the server please lmk

  • Rocketry Treasurer

EHS Update

Vann

  • Met w/ Lindsey Wright Wednesday

    • She seems very receptive to testing

    • She is having a pad installed for us

Feed system

Ceaser

  • “I looked into the potential of controlling the mass flow rate of the pressurant with the feed system rather than the ox and fuel. This has the opportunity of halving the number of needed valves, however more research needs to be done on digitalizing mass flow, considerations with the n2o and controlling the mass ratio”

Cold Gas

Colden & Jake

  • Designing trust mechanism over break

  • Check for annemomenter

Injector Prototyping

Tripton

  • Very successful test of new injector

    • Consider blowdown

Labview GUI

Thomas

  • GUI has not progressed

Image Added

Ignition

Jonh

  • Looking into igniter design

    • Interested in UC valve hybrid

    • N2O and some fuel

Vann Updates

  • Test stand cleaning is complete

  • Ordering better springs for test stand

  • Igniter testing is underway

    • @colden/jake when can I take the power supply?

TCA

Evan

  • Clean up welding

✅ Action items

  •  @colden @jake Print more nozzles to optimize airspeed
  •  @tripton Figure out a setup for blowdown and print new
  •  @evan machine ablator out before break
  •  

⤴ Decisions